Why Are There Two R-Mark Certifications, One For Rack And ...
Offered as two separate certifications to manufacturers of industrial steel storage racks and of welded wire rack decking, RMI’s R-Mark assures storage rack users that the rack frame, beam and decking capacities shown in a unique design’s load table were ...
Why Your Rack Installation Needs Load Beam Locking Devices
For the safety of the racking structure and the persons and machinery working in and around it, RMI’s ANSI MH16.1-2012: Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks calls for the installation of beam locking devices ...
Mix Racking From Different Manufacturers At Your Own Risk
In many cases, rack collapses are caused by unsafe mixing and matching of incompatible components from different manufacturers (also known as “intermembering”). If a rack column or beam is damaged, an owner might erroneously believe that it can be replaced ...
How Do Building Codes Impact Rack Design and Installation?
Although a rack structure may look like a standalone installation within a building, the safety of its design and installation are governed similarly to that of the facility itself. In fact, the 2015 International Building Code (IBC)—developed by the International ...
What Is An R-Mark Certification And Why Is It Important?
RMI’s R-Mark Certification is a voluntary program for manufacturers of industrial steel storage racks and of welded wire rack decking. Certification assures storage rack users that the rack frame, beam and decking capacities shown in a unique design’s load table ...
Do These Four Things Before Reconfiguring Pallet Rack
With most pallet rack manufactured for adjustability and assembly in multiple configurations, an owner might think an existing installation can be safely reconfigured at will. For example, to increase storage density, why not convert five-beam racking to six by decreasing ...
Why Are Load Capacity Plaques Important?
Regardless of when a steel storage rack installation was designed, commissioned and installed, the original stamped and sealed engineering documentation detailing the maximum safe rack capacity should be kept on-site within a facility. However, chances are that paperwork is likely ...